Project Ant London Distribution Park
Location:
Tilbury
Client:
Legal and General
Our Services:
Due Diligence, Fund Monitor
Accommodation created:
Warehouse Distribution Centre
Contract value:
Circa £130 million
Contract period:
56 weeks
Contract type:
JCT Design & Build 2011
The project comprises the construction of a 2 million sq ft steel-framed fully automated distribution centre set on four levels. The scheme also includes of 115,000 sq ft office accommodation, a haulier park and a new bridge link to the site.
The building will use the newest models of Amazon’s Kiva robots and will become a prototype for Amazon’s future European distribution centres.
The site is set within a former flood storage area and therefore a number of flood compensation measures have been built into the scheme to bring the status of the site up to flood zone 3a. These include raising ground levels and the construction of a new flood defence bund around the perimeter of the site.